Fiber Laser Metal Cutting Machine with Tube Cutting Attachment
  • LASER source 3.0 KW
  • Pallet changer with cutting Area 2000 x 4000 mm
  • MS-upto 20 mm ,
  • Stainless steel – upto 8 mm,
  • Aluminium – upto 6 mm
  • Tube Capacity: Round 200mm dia, Sq. Pipe – 140 mm x6.0 meter

 

Manufacturing  Facilities 
S. Machine Model & Make Machine Type Date of Commissioning Capacity
1 LL15TL3:-LMW Turning Centre JULY-2011 Dia.300 x 350 mm long
2 LT-20:- LOKESH Turning Centre AUG.-2018 Dia. 300 x 500 mm long
3 ALPHA:- SRI YANTRA Turning Centre ( Flat bed) DEC-2015 Dia. 350 x1500 mm long
4 RIG250-REKHA CNC ID Grinder MAY-2012 ID 20 to 150 x 200 mm Long
5 AC255 NT- AMADA CNC Turret Punch Press APRIL-2014  Sheet Size 2500 x 1250 mm,
6 RG-80-AMADA NC Press Brake APRIL-2014 80KN bending force
7 KAFO- KFB40 Vertical Machining Center APRIL-2019 1270x650x550 mm traverse, ATC24
8 POWER PRESS Crank Type SEP.-2013 30 TON
9 MIG- 300i MIG WELDING IGBT AUG.-2019 300AMP.
 Apart from this we are well supported with all Grinding facilities for Surface, Cylindrical, Tool and Cutter and Centre less grinding applications.

Land :-  20000 sq.ft.(100’x200’), is located close to INDO RAMA temple.

Building : Shop floor – 95’x140’ (13300 Sq.ft.), office &  other 1000 sq.ft.

Metrological  Facilities
S.NO. INSTRUMENT NAME TYPE RANGE
1 MICRO METER MECHANICAL 0-300MM
2 VERNIER CALIPER MECHANICAL/ DIGITAL 0-600MM
3 DIAL INDICATOR MECHANICAL 0.001-0.01 LC
4 HEIGHT VERNIER MECHANICAL 0-600MM
5 BORE DIAL GAUGE DIAL TYPE / MECHANICAL 18-150MM
6 SURFACE PLATE GRADE-I 600X600MM
7 COMPARATOR STAND OD/ID OD:-30-150MM/ ID:-20-140MM
8 SETTING RINGS ID MASTERS AS PER REGULAR COMPONENTS
9 SETTING MASTERS OD MASTERS AS PER REGULAR COMPONENTS
10 THREAD PLUG GAUGES INTERNAL THREADING AS PER REGULAR COMPONENTS
11 THREAD RINGS OUTER THREADING AS PER REGULAR COMPONENTS
System Development
S.NO. ACTIVITES DURATON PRAPOSED COMPLTION DATE
1 LEAN IMPLEMENTATION 18 MONTHS JUN-2020
2 IATF-16949 12 MONTHS AUG-2020